寶山基地一號(hào)高爐大修改造環(huán)縫洗滌裝置招標(biāo)公告

發(fā)布時(shí)間: 2024年10月17日
摘要信息
招標(biāo)單位
招標(biāo)編號(hào)
招標(biāo)估價(jià)
招標(biāo)聯(lián)系人
招標(biāo)代理機(jī)構(gòu)
代理聯(lián)系人
報(bào)名截止時(shí)間
投標(biāo)截止時(shí)間
關(guān)鍵信息
招標(biāo)詳情
下文中****為隱藏內(nèi)容,僅對(duì)千里馬會(huì)員開(kāi)放,如需查看完整內(nèi)容請(qǐng) 或 撥打咨詢熱線: 400-688-2000
相關(guān)單位:
***********公司企業(yè)信息
***********公司企業(yè)信息
**基地一號(hào)高爐大修改造環(huán)縫洗滌裝置招標(biāo)公告

發(fā)布時(shí)間:2024-10-17

**基地一號(hào)高爐大修改造環(huán)縫洗滌裝置招標(biāo)公告

發(fā)布日期:2024-10-17

招標(biāo)編號(hào):****

招標(biāo)編號(hào)(國(guó)際招標(biāo)網(wǎng)):0721-****030G0195

****(以下稱招標(biāo)機(jī)構(gòu))受****(以下稱買(mǎi)方)委托,****基地一號(hào)高爐大修改造環(huán)縫洗滌裝置所需的下列貨物進(jìn)行公開(kāi)招標(biāo),邀請(qǐng)合格投標(biāo)人進(jìn)行網(wǎng)上電子投標(biāo)。

標(biāo)段編號(hào):****/01

標(biāo)段名稱:**基地一號(hào)高爐大修改造環(huán)縫洗滌裝置

1.招標(biāo)貨物名稱、數(shù)量、技術(shù)規(guī)格和資金來(lái)源:

招標(biāo)貨物名稱:環(huán)縫洗滌裝置

數(shù)量:1套

技術(shù)規(guī)格:

投標(biāo)人技術(shù)方案應(yīng)具有合理性和完整性,所采用的工藝技術(shù)應(yīng)是成熟可靠的,能耗應(yīng)體現(xiàn)先進(jìn)性和節(jié)能性,相應(yīng)的工藝、儀表、電氣設(shè)備等應(yīng)配套完整,在工作環(huán)境下能正??煽渴褂?,本招標(biāo)書(shū)設(shè)備及服務(wù)招標(biāo)范圍如下:

a) 投標(biāo)人所供設(shè)備的基本設(shè)計(jì)、詳細(xì)設(shè)計(jì)及煤氣凈化系統(tǒng)的基本設(shè)計(jì)。

b) 環(huán)縫洗滌器組件,每套組件包括上部連接管、耐磨保護(hù)罩、文丘里形外殼、內(nèi)錐體、驅(qū)動(dòng)桿、干油集中潤(rùn)滑裝置、帶位置控制器的液壓缸等。

c) 預(yù)洗滌段和環(huán)縫洗滌段的噴嘴。

d) 預(yù)洗滌段和環(huán)縫洗滌段的液動(dòng)排水控制閥組。

e) 用于環(huán)縫洗滌器、排水控制閥的成套液壓設(shè)備(含獨(dú)立的控制系統(tǒng))。

f) 干油潤(rùn)滑自動(dòng)充填裝置。

g) 高壓冷凝水排水裝置。

h)相關(guān)的電控和儀表設(shè)備。

對(duì)裝置本體及附屬設(shè)備的總體要求如下:

(1) 環(huán)縫洗滌器及配套裝置應(yīng)安全可靠,不能影響高爐的操作;

(2) 環(huán)縫洗滌器在正常使用條件下的壽命應(yīng)不少于一代爐齡(≥18年);

(3) 在一代爐齡內(nèi)不能因灰塵堵塞、煤氣清洗設(shè)備腐蝕等問(wèn)題導(dǎo)致的專門(mén)維護(hù)檢修,引起高爐休風(fēng)。

(4) 環(huán)縫洗滌器一般保持恒壓差操作,其值可調(diào),但配套的液壓設(shè)備應(yīng)具有環(huán)縫全行程工作的能力。

(5) 配置環(huán)縫洗滌器、排水控制閥液壓驅(qū)動(dòng)裝置服務(wù)的液壓站。用于驅(qū)動(dòng)環(huán)縫洗滌器、排水控制閥閥臺(tái)布置在現(xiàn)有液壓站內(nèi)(現(xiàn)有液壓站距環(huán)縫洗滌塔直線距離50~70米,液壓站內(nèi)為非防爆區(qū));油泵、油箱及循環(huán)冷卻加熱裝置、蓄能器布置在現(xiàn)有液壓站內(nèi)(非防爆),但布置在煤氣設(shè)施外緣3米范圍內(nèi)的電氣設(shè)備要求防爆。

(6)環(huán)縫洗滌段及脫水器排水要求排入現(xiàn)有高架水槽內(nèi),通過(guò)高架水槽送至水處理,現(xiàn)有高架水槽底部相對(duì)標(biāo)高4.85m。

上述設(shè)備均由投標(biāo)人成套供貨,在調(diào)試階段所有因非招標(biāo)人原因造成損壞元器件均由投標(biāo)人免費(fèi)提供。

其他要求詳見(jiàn)招標(biāo)文件技術(shù)部分。

資金來(lái)源:現(xiàn)匯項(xiàng)目

2. 交貨地點(diǎn)和交貨時(shí)間:

交貨地點(diǎn):國(guó)外設(shè)備:CIF**;國(guó)內(nèi)設(shè)備:**基地1號(hào)高爐項(xiàng)目現(xiàn)場(chǎng)

交貨時(shí)間:國(guó)外設(shè)備:2025年8月30日FOB; 國(guó)內(nèi)設(shè)備:2025年9月30日DDP**基地1號(hào)高爐項(xiàng)目現(xiàn)場(chǎng)

3.*凡確認(rèn)投標(biāo)的投標(biāo)人請(qǐng)登錄中國(guó)國(guó)際招標(biāo)網(wǎng)平臺(tái)(http://www.****.com),務(wù)必在開(kāi)標(biāo)前注冊(cè)為其會(huì)員并通過(guò)年檢以獲得投標(biāo)資格,中標(biāo)情況將在中國(guó)國(guó)際招標(biāo)網(wǎng)公示。

寶華智慧招標(biāo)共享平臺(tái)(https://www.****.com)和中國(guó)招標(biāo)投標(biāo)公共服務(wù)平臺(tái)(http://bulletin.****.com/****公司的招標(biāo)項(xiàng)目信息(邀請(qǐng)招標(biāo)除外),有興趣的投標(biāo)人可以登錄查看。登錄后,投標(biāo)人可在寶華智慧招標(biāo)共享平臺(tái)上購(gòu)買(mǎi)招標(biāo)文件進(jìn)行投標(biāo)和開(kāi)標(biāo)活動(dòng)。

4. 購(gòu)買(mǎi)招標(biāo)文件時(shí)間:2024年10月18日起到2024年10月25日止。

5. 招標(biāo)平臺(tái)使用費(fèi):招標(biāo)文件英文版及中文版一套(電子版),若中文和英文版有沖突以中文版為準(zhǔn)。

1,500.00元人民幣或250.00美元整。

招標(biāo)文件均按標(biāo)段進(jìn)行計(jì)價(jià)出售,投標(biāo)人成功購(gòu)標(biāo)后,自行下載招標(biāo)文件和投標(biāo)文件模板。招標(biāo)文件一經(jīng)售出不得退還。

6. 投標(biāo)截止時(shí)間和開(kāi)標(biāo)時(shí)間:2024年11月08日09時(shí)00分(**時(shí)間)。投標(biāo)人應(yīng)于投標(biāo)截止時(shí)間前在寶華智慧招標(biāo)共享平臺(tái)成功遞交所有電子投標(biāo)文件。

7. 開(kāi)標(biāo)方式:一步法。

8. 開(kāi)標(biāo)地點(diǎn):寶華智慧招標(biāo)共享平臺(tái)電子開(kāi)標(biāo)大廳。

9. *對(duì)投標(biāo)人的資格要求:

(1)未被國(guó)家企業(yè)信用信息公示系統(tǒng)(www.****.cn)列入嚴(yán)重違法失信企業(yè)名單(如適用);

(2)未被“信用中國(guó)”網(wǎng)站(www.****.cn)列入失信被執(zhí)行人名單(如適用);

(3)由于項(xiàng)目復(fù)雜,技術(shù)要求高,投標(biāo)人均應(yīng)在開(kāi)標(biāo)前與招標(biāo)人聯(lián)系開(kāi)展技術(shù)交流并簽訂技術(shù)協(xié)議。未能簽訂技術(shù)附件的投標(biāo)人,其投標(biāo)將被否決。若簽訂的技術(shù)附件與招標(biāo)文件的技術(shù)要求有差異,以招標(biāo)文件為準(zhǔn)。****中心聯(lián)系人:譚金軍,聯(lián)系方式:(電話) 137****9820,(郵箱)****@baosteel.com。

(4)本項(xiàng)目不接受代理商投標(biāo)。

(5)投標(biāo)人應(yīng)具有高爐煤氣環(huán)縫洗滌裝置的供貨業(yè)績(jī)。

10. 本項(xiàng)目不接受聯(lián)合體投標(biāo)。

11.招標(biāo)人相關(guān)信息:

招標(biāo)人聯(lián)系人:譚金軍

招標(biāo)人郵箱:****@baosteel.com

招標(biāo)人電話:173****2301

12. 未領(lǐng)購(gòu)招標(biāo)文件的不得參加投標(biāo)。

13. 客服熱線:****800060 (有關(guān)投標(biāo)人CA辦理事項(xiàng)的咨詢)

傳 真:021-****1125

網(wǎng)上購(gòu)標(biāo)方法:具體操作方法詳見(jiàn)寶華招標(biāo)網(wǎng)“操作指南”。

項(xiàng)目經(jīng)理:胡冬艷 (有關(guān)商務(wù)、技術(shù)問(wèn)題或招標(biāo)文件異議可致電項(xiàng)目經(jīng)理。)

電 話:021-****1034

電子郵件:****@baosteel.com

業(yè)務(wù)咨詢:021-****1080(業(yè)務(wù)咨詢電話3)

招標(biāo)機(jī)構(gòu)地址:**市**區(qū)**路550弄8號(hào)樓

購(gòu)標(biāo)時(shí)人民幣付款采用第三方支付,外幣付款可以匯款到相應(yīng)外幣賬戶內(nèi)

開(kāi)戶銀行(外幣):建行寶鋼**支行

收 款 人:****

賬 號(hào):

美元:310********229110041

Swift Code: PCBCCNBJSHX


Annular Gap Scrubbing Unit of Baoshan Base No.1 Blast Furnace Overhaul and Revamping Project

Issue Date:2024-10-17

Tendering No:****

Tendering No. (China International Bidding Website):0721-****030G0195

Shanghai Baohua International Tendering Co., Ltd.(Hereinafter referred to as Tendering Agency) is commissioned by Baoshan Iron Steel Co., Ltd(Hereinafter referred to as tenderer) on Open Tendering for the following goods required in Annular Gap Scrubbing Unit of Baoshan Base No.1 Blast Furnace Overhaul and Revamping Project invites eligible bidders to online e-bidding.

Bid section No:****/01

Bid section Name:Annular Gap Scrubbing Unit of Baoshan Base No.1 Blast Furnace Overhaul and Revamping Project

1. The name, quantity, technical specifications and fund sources of goods for tendering:

The name:Annular Gap Scrubbing Unit

Quantity:1 set

Technical specifications:

The technical scheme of bidders should be reasonable and complete. The process and technology adopted should be mature and reliable. Energy consumption should reflect advanced nature and energy saving. The corresponding processes, instruments, electrical equipment, etc. should be completely matched and can be used normally and reliably in the working environment. The scope of equipment and service bidding for this bidding document is as follows:

a) The basic design and detailed design of the equipment supplied by the bidder and the basic design of the gas purification system.

b) Annular gap scrubber components. Each set of components includes upper connecting pipe, wear-resistant protective cover, Venturi-shaped shell, inner cone, drive rod, centralized grease lubrication device, hydraulic cylinder with position controller, etc.

c) Nozzles for the pre-washing section and the annular gap washing section.

d) Hydraulic drain control valve group for pre-washing section and annular gap washing section.

e) Complete set of hydraulic equipment (including independent control system) for annular gap scrubber and drain control valve.

f) Automatic filling device for grease lubrication.

g) High-pressure condensate drainage device.

h)Related electrical control and instrumentation equipment.

The general requirements for the device body and ancillary equipment are as follows:

(1) The annular gap scrubber and supporting devices should be safe and reliable and cannot affect the operation of the blast furnace;

(2) The service life of the annular gap scrubber under normal use conditions should be not less than one generation of furnace campaign (≥18 years);

(3) During the campaign of one generation of the blast furnace, there should be no special maintenance and repair caused by problems such as dust blockage and corrosion of gas cleaning equipment that leads to the shutdown of the blast furnace.

(4) The annular gap scrubber generally maintains constant pressure difference operation, and its value is adjustable. However, the supporting hydraulic equipment should have the ability to work over the full stroke of the annular gap.

(5) Configure a hydraulic station that services the hydraulic drive device for the annular gap scrubber and drain control valve. The valve stations for driving the annular gap scrubber and drain control valve are arranged in the existing hydraulic station (the linear distance between the existing hydraulic station and the annular gap scrubber tower is 50-70 meters. The hydraulic station is a non-explosion-proof zone ). The oil pump, oil tank, and circulating cooling and heating device, and accumulator are arranged in the existing hydraulic station (non-explosion-proof). However, electrical equipment arranged within 3 meters of the outer edge of gas facilities requires explosion-proof.

(6) The drainage of the annular gap washing section and dehydrator is required to be discharged into the existing elevated water tank and sent to water treatment through the elevated water tank. The relative elevation of the bottom of the existing elevated water tank is 4.85m.

All the above equipment is supplied in sets by the bidder. During the commissioning stage, all components damaged due to reasons other than those of the tenderee shall be provided free of charge by the bidder.

Please refer to technical part for other requirements.

Fund sources of goods:Cash items

2. Delivery time and place:

Delivery time:for imported parts: Aug.30, 2025 (FOB). for local supplied parts: Sep.30 (DDP: at the site of blast furnace No.1 overhauling project in Baoshan base)

Delivery place:for imported parts: CIF shanghai. for local supplied parts: at the site of blast furnace No.1 overhauling project in Baoshan base

3. *The bidders who have confirmed to participate the bid must log on China International Bidding Website (http://www.****.com), and register. Please make sure you have registered and passed through the annual review before bidding. The awarding will be publicized on China International Bidding Website.

Baohua E-bidding website (http://www.****.com) and China Tendeing Bidding Public Service Platform (http://bulletin.****.com) could also provide the information about tendering project of our company (except invitation of tendering), interested bidders may login to view relevant information. After login, the bidder could purchase tendering document and bid online.

4. Time for purchasing Tendering documents: Starting from:2024-10-18 to 2024-10-25 (Beijing time).

5. Sales prices of the tendering document: One complete set of Tendering Documents both in English and Chinese ( electronic version included). The Chinese language shall govern in case of any discrepancy between Chinese language and the English language.Sales price is 1,500.****.00USD

All tendering documents will be sold per bid package (or section). After purchasing the bid, the bidder can download the tendering document and the template of bidding document. The tendering documents sales are non-refundable.

6. Deadline for bid submission and Bid Opening Time:2024-11-08 09:00(Beijing time). The bidder shall submit all bidding documents on Baohua tendering website before the bidding deadline.

7. Bid opening method :One-step of opening。

8. E-bid opening place:Bid opening hall on Baohua Intelligent Bidding Integrated Platform。

9. *Requirements of Bidder’s qualification:

(1) Not been listed in the list of seriously illegal and dishonest enterprises by the National Enterprise Credit Information Publicity System (www.****.cn)(if applicable).

(2) Not been included in the list of persons subject to enforcement for trust-breaking on the website of "Credit China" (www.****.cn)(if applicable).

(3) Due to the complexity of the project and high technical requirements, all bidders interested in the participation in this project shall contact the tenderee for technical communication and conclude the technical agreement with the tenderee before the bid opening. Bids from bidders who fail to conclude the technical attachment will be rejected. If there is any difference between the signed technical appendices and the technical requirements of the tender document, the tender document shall prevail. Contact for technical communication: Mr. Tan Jinjun, the ontact person of Equipment Procurement Center, Tel: 137****9820; Email: ****@baosteel.com).

(4) Don't accept the agent bid.

(5) The bidder should have the supply performance of gas annular gap Scrubbing Unit.

10. This project consortium bidding is not accepted

11.Information about the tenderer:

Tenderer contact:譚金軍

Tenderer's mailbox:****@baosteel.com

Tenderer telephone:173****2301

12. Tel:****800060 (consulting for bidders CA affairs)

Fax:021-****1125

Online tendering document purchase: please refer to "HELP" for details on Baohua tendering website.

Bid manager: (contact project leader for commercial, technical problems of tendering project, or objections to tendering documents)

Tel:021-****1034

E-mail:****@baosteel.com

Bussiness Consulting Tel: 021-****1080(Bussiness Consulting Tel 3)

Bid agency address:No.8, 550 Long KeShan Road, Bao Shan District,Shanghai, China

When purchasing the tendering document, the payment in RMB shall be made by the third party, and the payment in foreign currency can be remitted to the corresponding foreign currency account.

Bank account:China Construction Bank, Baoshan Baosteel Branch

Beneficiary:Shanghai Baohua International Tendering Co., Ltd.

Account Number

USD:310********229110041

Swift Code: PCBCCNBJSHX

附件:
附件(1)
招標(biāo)進(jìn)度跟蹤
2024-10-17
招標(biāo)公告
寶山基地一號(hào)高爐大修改造環(huán)縫洗滌裝置招標(biāo)公告
當(dāng)前信息
招標(biāo)項(xiàng)目商機(jī)
暫無(wú)推薦數(shù)據(jù)